Repair Addendum Turned Around Before Closing

Justin Matthews • September 3, 2026

Inspection report to scoped punch list

Location: Greenville, SC

The problem. An agent sent a signed repair addendum with a closing date eleven days out and a mix of items — some ours, some requiring licensed specialists.

What we did.

  • Read the addendum against the full inspection report to catch items the summary had compressed
  • Built an itemized scope tied line by line to the addendum
  • Separated what we perform from what gets coordinated with licensed specialists, and named both in the scope
  • Scheduled the licensed specialists first so their work did not block ours
  • Completed our items and provided documentation for the file

The result. Closing held. The agent had a scope she could hand to both parties, with nothing ambiguous two days out.

By Justin Matthews September 3, 2026
Storm door and front entry door installation in Greenville, SC — squaring an older opening and weatherstripping a door that leaked daylight.
By Justin Matthews September 3, 2026
A failed P-trap at a Greenville dental office handled as an emergency service call, with the practice operating the same day.