700 sq ft Deck: Boards, Joists, Stairs and Rails Before Thanksgiving

Justin Matthews • September 3, 2026

Deck boards, ten joists, stairs and rails

Location: Greenville, SC

The problem. The homeowner asked for new deck boards. Underneath, ten joists were soft and the stair stringers had separated from the framing.

What we did.

  • Removed the full deck surface and assessed the framing before quoting the real scope
  • Replaced ten compromised joists and added a support beam where the span was undersized
  • Rebuilt the stairs, including new stringers and treads
  • Replaced all deck boards and railing caps
  • Sealed every cut end, including the faces bearing on framing

The result. Finished before Thanksgiving. The homeowner came for a resurface and got a structurally sound deck, because we looked underneath first.

By Justin Matthews September 3, 2026
Storm door and front entry door installation in Greenville, SC — squaring an older opening and weatherstripping a door that leaked daylight.
By Justin Matthews September 3, 2026
A failed P-trap at a Greenville dental office handled as an emergency service call, with the practice operating the same day.