700 sq ft Deck: Boards, Joists, Stairs and Rails Before Thanksgiving

Justin Matthews • September 3, 2026

Deck boards, ten joists, stairs and rails

Location: Greenville, SC

The problem. The homeowner asked for new deck boards. Underneath, ten joists were soft and the stair stringers had separated from the framing.

What we did.

  • Removed the full deck surface and assessed the framing before quoting the real scope
  • Replaced ten compromised joists and added a support beam where the span was undersized
  • Rebuilt the stairs, including new stringers and treads
  • Replaced all deck boards and railing caps
  • Sealed every cut end, including the faces bearing on framing

The result. Finished before Thanksgiving. The homeowner came for a resurface and got a structurally sound deck, because we looked underneath first.

By Justin Matthews • September 10, 2026
Four different numbers, and the thing that decides which one you get is not how long we are there. It is how much you already know.
By Justin Matthews • September 3, 2026
Storm door and front entry door installation in Greenville, SC — squaring an older opening and weatherstripping a door that leaked daylight.